Asphalt Concrete
Asphalt concrete is rock held together by just enough sticky binder, and the air left over matters most.
Before this Lesson
Look down at an old road on a hot afternoon. One stretch has two grooves pressed along the wheel paths, with a slick black sheen in them. Another stretch, paved the same year, is cracking and shedding loose stones. Both are made of the same two things: rock, and about 5% binder by weight.
A point or two of binder can be the difference between those two failures. So how does anyone know when a mix has enough? The check takes two specific gravities and one short formula, and you'll run it by the end of this Lesson.
Rock carries the load
In portland cement concrete, the paste hardens into a solid that carries load between the stones. Asphalt binder never does that. It's a thick, sticky petroleum product that stiffens as it cools and softens again on a hot day. If a truck's weight had to pass through it, every summer would squeeze the road flat.
So in asphalt concrete, the rock does the carrying. Stones press directly against stones, forming a skeleton, and the load travels down through those contacts. The binder has two jobs: glue the skeleton together, and seal it so air and water stay out. Rolling the hot mix packs it tight, but some air always stays trapped.
A finished mix has four jobs, each named for what it has to do:
- Stability: hold its shape under wheels, with no ruts or shoving.
- Durability: last through years of air and water, without the binder going brittle or the stones coming loose.
- Flexibility: bend over a slowly settling base without cracking.
- Skid resistance: give tires grip, especially in the rain.
The Handbook has no asphalt section at all, so everything in this Lesson is knowledge you bring into the exam yourself.
Building the skeleton
Pour marbles on a table and press down with your palm. They roll out from under your hand. Do the same with crushed rock, and the flat faces bear on each other, the corners catch, and the pile pushes back. That's particle shape in one experiment. Crushed, angular, rough-textured stone locks together and gives high stability. Smooth, rounded river gravel slides past itself and gives low stability, however good the binder is.
The other half of the skeleton is its gradation, the mix of stone sizes. Three patterns cover it.
- Dense-graded has every size from coarse to fine, so smaller stones fill the gaps between bigger ones. Its few small voids don't connect. This is the usual road surface.
- Open-graded is mostly coarse stone with few fines, so the gaps connect and water runs right through, draining rain away from the tires. With little to brace its stones and its binder exposed to air and water, it gives up stability and durability, though the looser skeleton has more give.
- Gap-graded leaves out the middle sizes. The big stones touch rock-on-rock, and a rich mortar of sand, fine filler, and binder packs between them. Done well, as in stone matrix asphalt, it's stable, tight, and rough on top. Without enough mortar, it drains like an open-graded mix.
| Gradation | Stability | Permeability | Skid resistance |
|---|---|---|---|
| Dense | High | Low | Moderate |
| Open | Lower | High | High, especially wet |
| Gap | High if stones touch | Low if gaps are filled | High |
Just enough binder
Now a thought experiment. Take hot, clean stone and add binder a little at a time, compacting a sample at each step.
At first the binder is spread thin. Its films barely cover the stones, so they're poorly glued, and the voids between them stay large and connected. Air gets in and hardens the thin films until they're brittle, and water pries them off the stone.
Add more. The films thicken, the stones stick better, and the binder lubricates them during rolling so they pack tighter. Stability climbs. Then the binder runs out of room. The voids are nearly full, so the next bit can only go between the stones, prying them apart. Rock-on-rock contact fades, and the load starts passing through the binder, which is what it can't take on a hot day. The extra binder also squeezes up to the surface and coats the stones in a slick film, which is called bleeding.
So stability rises to a peak and falls again, and the top of that hump is near the optimum binder content. Air voids behave more simply. They fall the whole way, since every added pound of binder takes room from the air, and that makes air a handy gauge: a mix near its optimum compacts to about 4% air.
Zero air isn't the goal, because a hot day expands the binder and traffic packs the mix a little tighter, and both need somewhere to go. Lab procedures such as Marshall and Superpave gyratory compaction choose the binder content by compacting trial specimens across a range of binder contents. You won't need their steps.
Matching the job to the mix
You now have enough to work out each job's recipe. A failed road tells you which job went undone, so start there, then ask what that job needs from the stone and the binder.
| Property | Prevents | Feature that maximizes it |
|---|---|---|
| Stability | Ruts, shoving | Crushed, angular, rough stone |
| Durability | Aging, loose stones | Fully coated stone, filled voids |
| Flexibility | Cracking | Open-graded mix, ample binder |
| Skid resistance | Sliding | Rough, hard stone, no excess binder |
These pull against each other. Flexibility wants the open skeleton that stability and durability don't, so no mix maxes out all four. A designer leans toward whatever would end this road first, and a question usually names the property it wants.
The air left over
From Absolute Volume Mix Design: a weight of material fills a volume . A stone's volume there meant its whole outline, pores included.
Now the numbers. Three specific gravities do the bookkeeping.
| Symbol | Name | What it describes |
|---|---|---|
| Bulk SG of compacted mix | The specimen, air included | |
| Maximum SG of the mix | The same mix with no air | |
| Bulk SG of the aggregate | Dry stone, pores in its outline |
comes from weighing a compacted specimen and finding its volume. comes from breaking up a loose sample and pulling the air out under vacuum. The same mix with no air is packed tighter, so always exceeds .
That gap is the air, and the weight-to-volume bookkeeping shows why. Take exactly 1 ft³ of compacted mix with . It weighs . Now squeeze out every bubble without losing a crumb. The weight hasn't changed, but the mix now has , so it fills only
The missing 0.04 ft³ was the air: 4%.
The same steps with any two values give the percent air voids:
This is the one formula here worth memorizing. The bottom of the fraction is , not , and a negative result means the two got swapped. Compare the answer with the target, usually about 4%. Well above it points to too little binder or too little compaction, and a porous mix. Well below it points to too much binder, and a mix that ruts and bleeds.
Two more measures look at the room between the stones. Voids in mineral aggregate (VMA) is all the space in the compacted mix that isn't stone: the air, plus the binder coating the stones. Binder that soaks into a stone's pores doesn't count, because already puts the pores inside the stone's outline. Voids filled with asphalt (VFA) is the percent of the VMA that binder fills.
Expect a question on these to give you the formulas, along with and the binder content:
Here is the aggregate and is the binder, each as a percent of the total mix weight. The VMA formula is the same squeeze: 1 ft³ of mix holds of as aggregate, dividing by gives that aggregate's volume, and the rest is VMA.