Absolute Volume Mix Design
Cement, water, rock, sand, and air have to fill exactly 27 cubic feet.
Concrete gets weighed into the truck and sold by the cubic yard. Suppose a wall's forms hold exactly 10 yd³, you order 10 yd³, and the plant's recipe really makes 9.7. Every scale was right to the pound, and the truck still runs dry with the top of the wall open.
So a recipe has to answer a question no scale can: how many cubic feet do these pounds fill? Take 600 lb of cement, 270 lb of water, 1,800 lb of gravel, and 6% air. How much sand finishes the yard? You can't get there by adding up piles, and the reason is the place to start.
Piles don't add up
Fill one bucket with gravel and another with sand, then pour both into a bigger container. You don't get two buckets' worth. The sand runs down into the gaps between the stones, and those gaps were never gravel to begin with. Add water and it does the same thing, settling into the gaps between the sand grains. A bucketful of aggregate is part material and part empty space, and the empty space doesn't survive the mixer.
So the volume that counts for each ingredient is the space the material itself occupies, with no gaps. That's its absolute volume, also called its solid volume. Water has no gaps to begin with, so its absolute volume is simply its volume.
It's also why a bucketful figure is the wrong tool here. A question may list a gravel's dry-rodded unit weight, the weight per cubic foot of gravel rodded into a container. That number has the gaps in it, so dividing by it gives the volume of a pile, not the volume of the stone.
From pounds to cubic feet
The bridge from weight to volume is specific gravity. The Handbook's Fluid Mechanics section defines it as : how many times heavier than water a material is, volume for volume. A cubic foot of water weighs 62.4 lb, so a solid cubic foot of cement, at an SG of 3.15, would weigh . That makes 600 lb of cement fill .
That's the whole move, and it works for every ingredient:
The Handbook's Phase Relationships section prints the same idea for soil solids, , and this is that equation solved for volume. Water has an SG of 1.00, so its volume is just its weight over 62.4.
In SI, work with mass in kilograms and the density of water, which the Handbook gives as 1,000 kg/m³:
So 400 kg of cement at an SG of 3.15 fills . The Handbook's Phase Relationships section also lists 9.81 kN/m³ for water. That's a weight per volume, and it pairs with kilonewtons, so it has no place under a mass in kilograms.
The Handbook stops there. It has no mix design, no specific gravities for cement or aggregate, and not even the 27 ft³ in a cubic yard. The method below is yours to carry, and a question gives you the specific gravities.
A stone's volume includes its pores
From Aggregate Moisture States: aggregate at saturated surface-dry (SSD) has full pores and a dry surface, so it neither gives water to the mix nor takes it. Mix sheets usually list aggregate weights at SSD, so the water on the sheet is the water the paste actually gets.
Cement and water are simple. A stone has pores, so which volume counts: the mineral alone, or the whole stone?
Lower an SSD stone into a brimful tank and watch. Its pores are already full, so it can't drink any of the tank, and its surface has no film to add. The water that spills measures the space inside the stone's outline, pores and all. Divide the stone's weight by the weight of that spilled water, and you have its specific gravity on the SSD basis.
The outline is the volume that counts, because the pores stay full in the mixer and nothing else can use that space. So a mix sheet's aggregate specific gravities are on the SSD basis, paired with SSD weights. The pore water gets counted once, inside the stone's weight and volume, and that's why it stays off the water line. The water line holds only the water that reaches the paste.
Twenty-seven cubic feet, no gaps
A cubic yard is 3 ft × 3 ft × 3 ft, or 27 ft³. Cement, water, and two aggregates, coarse (the gravel) and fine (the sand), fill most of it, each at its absolute volume, and air fills the rest. Air works differently, because it comes as a percent rather than a weight. That percent is of the whole volume of concrete, which is what the pressure meter from Workability, Air Entrainment, and Admixtures reads. At 6% air, a yard holds of air, not 6% of the other ingredients' volume.
So the whole method comes down to making the volumes add up:
A yard has no slack, so anything that takes more room leaves less for something else.
Finding the sand
Back to the question at the top of the Lesson. The sand is usually the last ingredient to settle, so it's the unknown. Turn every known weight into a volume, take the air as its percent of the whole, and subtract from 27. What's left is the sand's absolute volume, and the same equation run backward gives its weight. In SI, the total is 1 m³ and the divisor is SG times 1,000 kg/m³, and nothing else changes.
Starting from the water
From Concrete Strength and the Water-Cement Ratio: W/C is the weight of water over the weight of cement, so .
Often a question doesn't hand you the cement. It gives the mixing water and W/C, since a designer picks the ratio for strength and the water for workability, and the cement follows from those two. Take the volumes of cement, water, and air off the 27, and what's left is the absolute volume the aggregates share. How they split it comes from tables the exam doesn't test, so a question gives you the gravel or stops at that number.
Finding the air
The budget doesn't care which line is blank. If a question gives all four weights, their volumes usually fall short of 27 ft³, and the gap is the air. Divide it by 27 for the percent.
Trial batches and yield
A recipe gets tested in a trial batch, which might be a few cubic feet in a lab or most of a yard at a plant, and it rarely comes to exactly 27 ft³. So the question flips: given these weights, how much concrete did you make? That volume is the batch's yield. The plant at the top of the Lesson had a yield problem: 9.7 yd³ where 10 were promised.
The cement, water, and aggregates add up as before. Air is the catch: its percent is of the total, and the total is now the unknown, so you can't take 4% of 27. Come at it from the other side instead. At 4% air, everything else is the other 96%.
Here is the absolute volume of everything except the air, and the air goes in as a decimal. Multiplying by 1.04 instead lands close, but that's 4% of the solids rather than 4% of the total.
Two more answers follow from the yield. The batch's weights are per batch, so scale by 27 over the yield to get a per-yard figure. And the fresh unit weight is the whole batch's weight over the volume it made, so a measured unit weight run backward gives the yield.
Fly ash and slag get their own line
When fly ash or slag replaces part of the cement, the bookkeeping gains one more line, at the replacement's own SG. Both are lighter than cement, fly ash especially, so a pound of either takes more room. At an SG of 3.15, 100 lb of cement fills 0.51 ft³. At an SG of 2.40, 100 lb of fly ash fills 0.67 ft³. W/CM, from Workability, Air Entrainment, and Admixtures, divides the water by cement plus fly ash plus slag. It counts weight, so a pound-for-pound swap leaves it alone, but the volume goes up, and so does the yield.
Every weight in this Lesson is a design weight, with the aggregates at SSD. Real stockpiles rarely are, so these are the numbers you'd carry into Moisture Corrections to Batch Weights. The same weight-to-volume bookkeeping comes back for compacted asphalt in Asphalt Concrete.