Stations and Grades

A grade is rise over run, and stations are how engineers count the run.

A road plan hands you a note: station 12+50, elevation 482.30, grade +2.5%. It looks like a code, but it's three plain facts: how far along the line this point sits, how high it is, and how steeply the road runs from there. By the end of this Lesson you'll read that note and say how high the road is at station 15+20, and at which station it reaches elevation 500.

A station is a distance

Stretch a tape measure down the centerline of a road, with its zero at the start of the line. Now every spot on the road has one number: how far along the tape it is. Surveyors mark the line every 100 ft, and each 100-ft length is a station, so they write that number to show which mark you've passed and by how much. Station 12+34.56 means 12 whole stations plus 34.56 ft, which is 1,234.56 ft from the line's origin.

The plus sign is only a divider, like a comma set two digits left of the decimal point so the hundreds of feet stand out. Nobody is asking you to add 12 and 34.56. To get feet, delete the plus: 12+34.56 becomes 1,234.56 ft, and 7+05 becomes 705 ft. To go back, put the plus two digits left of the decimal point.

0+00 origin 11+00 12+00 13+00 12+34.56 stations increase 100 ft 34.56 ft 1,234.56 ft
Station 12+34.56 sits 34.56 ft past the 12+00 mark

The distance between two stations is a subtraction in feet. From 7+80 to 8+25 is 825−780=45 ft825 - 780 = 45\ \text{ft}. That short run happens to cross a station mark, which changes nothing: it's 45 ft, not 0.45 ft and not 45 stations.

The Handbook never explains this notation, so this one you carry in your head. Unless a problem says otherwise, a station is 100 ft.

A grade is rise over run

Now give the line some height. As you walk along the tape, your elevation changes. (Those elevations usually come from a level run, the subject of Differential Leveling; here they're simply given.) On a straight grade, every foot forward changes your elevation by the same amount, and that amount is the grade: rise divided by run.

g=Y2−Y1x2−x1percent grade=100 gg = \frac{Y_2 - Y_1}{x_2 - x_1} \qquad \text{percent grade} = 100\,g

Here YY is elevation, xx is distance along the line in feet, and gg is the decimal grade, in feet of rise per foot of run. It's the slope of a straight line, and the Handbook's Straight Line formulas, under Mathematics, print it as m=(y2−y1)/(x2−x1)m = (y_2 - y_1)/(x_2 - x_1).

Percent means per hundred, which is why stations and percent grades get along so well. A 2% grade rises 2 ft in every 100 ft, so it rises 2 ft per station. The elevation keeps step with the station marks, as this profile shows.

500.00 502.00 504.00 503.00 502.00 10+00 11+00 12+00 13+00 14+00 stations increase +2% −1% 100 ft 2 ft 100 ft 1 ft vertical scale exaggerated
A road profile: +2% for two stations, then −1% for two

A plan grade's sign belongs to the stationing, not to whoever is traveling. It's positive when the line rises ahead on station, toward increasing stations, and negative when it falls. In the profile, the left stretch is +2% and the right stretch is −1%. A driver heading from right to left climbs the −1% stretch, and the plan doesn't change to suit them. The formula gets the sign right on its own, as long as you subtract in the same order on top and bottom.

Worked Example The grade between two points on a road
1 of 3

A road's profile has elevation 214.60 ft at station 3+75 and 222.85 ft at station 9+25. Find the percent grade.

Elevations along a straight grade

If every foot of run changes the elevation by gg, then one known point and the grade give you the elevation everywhere on that grade. Take the run, multiply by gg, and add it on. This works on any straight grade, such as a sewer invert, the inside bottom of the pipe, or a road tangent, a straight stretch of a road's profile.

Y2=Y1+g (x2−x1)Y_2 = Y_1 + g\,(x_2 - x_1)

Check it on the profile above. Starting from 500.00 ft at 10+00 with g=0.02g = 0.02, station 12+00 is 200 ft along, so Y=500.00+(0.02)(200)=504.00 ftY = 500.00 + (0.02)(200) = 504.00\ \text{ft}. The Handbook prints the same line under Vertical Curves, as tangent elevation = YPVC+g1xY_{\text{PVC}} + g_1 x. There, PVC names the starting point, xx is measured from it, and g1g_1 is the percent grade divided by 100.

Let the signs do the work. A falling grade has a negative gg, and a station behind you has a negative x2−x1x_2 - x_1. Put them in as they are, and the answer comes out higher or lower by itself. A quick sketch of the line tells you which to expect.

Run the same relation backward to find where the grade reaches a given elevation. The elevation you need to gain, divided by what you gain per foot, is how far you have to go:

x2=x1+Y2−Y1gx_2 = x_1 + \frac{Y_2 - Y_1}{g}

That gives feet, so finish by writing it as a station. Here especially, gg has to be the decimal, because dividing by the percent grade leaves you a hundred times short.

Worked Example The note from the road plan
1 of 3

A road tangent has elevation 482.30 ft at station 12+50 and a grade of +2.5%. Find its elevation at station 15+20, and the station where it reaches elevation 500.00 ft.

One steepness, four spellings

Percent grade, decimal grade, feet per station, and slope ratio all say how steep a line is, and a problem can hand you any one of them and ask for another. You already have percent to decimal: divide by 100. A slope given in ft/ft is that same decimal. Feet per station is the decimal grade times the station length. On 100-ft stations that hands the percent number right back, but only as a coincidence of hundreds: on 50-ft stations, a 2% grade is 1 ft per station.

Side slopes of cuts and embankments are usually written as a ratio, H:V, horizontal first with the vertical as 1. The grade is g=V/Hg = V/H, so a 2:1 slope, 2 ft across for every 1 ft up, has g=1/2=0.50g = 1/2 = 0.50, a 50% grade. Math class taught you to read a slope of 2 as steep, and 2:1 looks just like it, but here the first number is the run. The bigger that number, the flatter the slope. To go the other way, H=1/gH = 1/g, so a 2% grade is 1/0.02=501/0.02 = 50, or 50:1. The Handbook prints no H:V notation at all, so this is another one you carry in your head.

H = 2 V = 1 2:1 50% 45° H = 1 V = 1 1:1 100% H = 1 V = 2 1:2 200%
Three slopes written H:V, drawn at one scale

The middle triangle is worth remembering, because a 100% grade isn't a wall. It's 1 up for 1 across, or 45°. A true wall has no run to divide by, so it has no percent grade at all.

One steepness in four forms
Percent gradeDecimal gradeFt per 100-ft stationH:V
2%0.02250:1
10%0.101010:1
50%0.50502:1
100%1.001001:1
Checkpoint
1 of 3

An embankment has a 4:1 side slope, written H:V. What is its percent grade?

A.
0.25%
B.
4%
C.
25%
D.
400%

Recap

  • A station is a distance: delete the plus to get feet, so 12+34.56 is 1,234.56 ft, and subtract feet to get the distance between stations.
  • A grade is rise over run, g=(Y2−Y1)/(x2−x1)g = (Y_2 - Y_1)/(x_2 - x_1), and the percent grade is 100 g100\,g. On a plan, it's positive when the line rises ahead on station, whichever way anyone is traveling.
  • Elevation changes in step with distance: Y2=Y1+g (x2−x1)Y_2 = Y_1 + g\,(x_2 - x_1). Run it backward, with the decimal gg, to find the station at a given elevation.
  • On 100-ft stations, a 2% grade rises 2 ft per station. On other lengths, multiply the decimal grade by the length.
  • A slope written H:V puts the horizontal first, so 2:1 is a 50% grade, not 200%.