Changing Effective Stress
Lower the water table, and the ground presses down harder without adding any soil.
Before this Lesson
In 1977 the hydrologist Joseph Poland was photographed beside a utility pole in California's San Joaquin Valley, southwest of Mendota. Signs up the pole mark where the ground had been in 1955 and, near the top, in 1925. In 52 years the ground he stood on had sunk about 9 m, nearly 30 ft.
Nobody dug that ground away or piled anything on it. Farmers pumped groundwater to irrigate, the water pressure deep down fell, and the clay layers there squeezed together under the same weight they'd always carried. This Lesson tracks what moves effective stress, and what happens when it reaches zero.
Two quantities, one subtraction
Effective stress is still , at every moment, so any change in it is
That's the whole Lesson in one line. moves only when and move by different amounts, so for each event that follows, the question is which of the two it moves, and how far. In the San Joaquin Valley, pumping cut and left nearly alone, so went up.
Weight added on top
Spread a new layer of fill across a whole site, or anything else that wide, such as a broad stockpile. Picture the column of ground on one square foot, as in Effective Stress, anywhere on the site. Every column gets the same new weight on top, so every point below gains the same total stress:
A surcharge stated as a pressure is simply . Under a single footing, by contrast, the added stress spreads and fades with depth, a case the Handbook gives no method for. The water table stays at the same elevation, so in the long run is unchanged and gains the full . The Handbook's Vertical Stress Profiles with Surcharge diagram draws exactly this: a surcharge it calls , added to and at every depth, with left alone.
The first day on clay
The example said "long after" for a reason: A is in clay. For to rise, the grains must press together harder, so the skeleton they form must squeeze a little tighter, and it can do that only if some water leaves the voids. Water barely compresses, and it creeps through a clay's fine pores. On the day the fill goes on, almost none has left.
Karl Terzaghi, who founded soil mechanics, pictured this as a spring in a cylinder of water, under a piston with a small hole in it.
At the instant of loading, the spring can't compress until water gets out of the way, so the water carries the whole load. As water leaks out, the piston sinks and the spring takes over, until it carries everything and the water is back at its starting pressure.
A saturated clay under a new fill does the same. Right after the fill goes on, and . That rise in is the excess pore pressure. It pushes water out toward the sand above or below, and as it bleeds away, climbs to its full gain and the clay settles. How long that takes is the subject of Time Rate of Consolidation. Sand drains so fast that it reaches the long-term state at once.
Meanwhile the clay's strength hasn't changed, though its load has. That's why the end of construction is often the riskiest moment for an embankment on soft clay.
Moving the water table
Pumping, a drought, or wells around an excavation can lower the water table. For a point below the new water table, two things change in the band of soil the water leaves:
- The band drains, so it weighs its moist instead of , and drops a little.
- The free surface is lower, so shrinks by the drop, and falls by per foot of it.
The second effect wins easily. For the site's sand, each foot of drop takes psf off but 62.4 psf off , so gains 47.4 psf. In general, with the drop,
It's the trade from the water-table problems in Effective Stress: each foot of the band swaps for . Every point below the new water table gains the same amount. In a clay the gain arrives only as its water drains, which is why the valley took decades to sink, and questions ask for the long-term value.
Use the moist unit weight the question gives for the drained band. If it says the soil stays saturated, doesn't change and the gain is per foot. Raising the water table runs the trade backward, until the water reaches the ground.
Fills, pumps, and floods each move , , or both. Before you calculate, it pays to know which way each one goes.
Pressure from below
Sometimes a clay caps a sand fed with water from higher ground, such as distant hills where the sand comes to the surface. The clay keeps that water from rising, so it's under more pressure than the water table above would give: an artesian, or confined, aquifer.
A piezometer is a standpipe open to the ground only at its tip. Water rises in it to above the tip, and that level, as an elevation, is the hydraulic head there. In a confined aquifer, it's called the piezometric surface. Water flows from higher head to lower, and the hydraulic gradient, , is the head lost per unit length of flow path. The Handbook writes . For more, see Groundwater and Darcy's Law.
The sand's water pushes up on the base of the clay with the pressure that holds up a piezometer's water, so there, is the height of the piezometric level above the base, not the depth below the water table. The Handbook calls the "uplift or pressure head," and here it earns the first name.
At B, the base of the clay:
Ordinary groundwater would give psf and psf, so the extra 8 ft of head takes 499 psf off the grains. Raise the level to about 18.5 ft above the ground, and at B reaches zero: the water would lift the clay off the sand.
Questions may give the piezometric level as a height, a depth, or an elevation. Turn it into a height above the point. Inside the clay, changes from one end to the other as water seeps up, so questions ask at the base.
When effective stress reaches zero
Push water up through sand instead of clay, and you can turn the effect up as far as you like. Picture a tank with a layer of sand thick on a screen, under standing water. A tube feeds water in below the screen from a reservoir whose surface stands above the tank's, so water flows up through the sand and spills over the top.
At the base of the sand, hasn't changed: it's still the water above plus the sand. But there now holds up a column reaching the reservoir's level, so it has gained , which comes straight off the still-water :
The water flowing up drags on the grains and holds up part of their weight. reaches zero when , the gradient through the sand, reaches the critical hydraulic gradient:
The Handbook prints the second form, unnamed, under Factor of safety against seepage liquefaction. From and , the Archimedes form gives
A typical sand, with and , has , and most sands land near 1, because submerged sand weighs about as much as water. Keep on top: gives a number near 2.
What's left of the sand? Its grains touch, but nothing presses them together, and a clean sand's strength is pure friction, which needs that pressing. So with its strength is zero, whatever its friction angle. Dense or loose, it behaves like a thick liquid, and a stone or a footing sinks into it. That's quicksand. It isn't a kind of sand but any sand with enough water rising through it, and when the flow stops, the same sand is firm again. At an excavation the floor seems to boil, so the failure is also called boiling.
Boiling at an excavation
In the field, the tank is an excavation. Steel sheet piles driven into sand hold back a river or high groundwater while the excavation goes in beside them, and pumps keep the water inside down at the floor. Outside it stands higher, so water flows down along the sheets, under their tips, and up through the floor.
Where it comes out, the water is flowing up through sand, as in the tank, and the gradient there is the exit gradient, . If the head is lost evenly along a flow path of length , . Questions give either or a head loss and a flow length. The Handbook's Factor of safety against seepage liquefaction compares the two gradients:
Above 1, the floor holds. Keep on top, because the inverse reads a safe floor as a failing one. For a required factor of safety, turn it around: the largest allowable exit gradient is , so the flow path must be at least
That's why one standard fix for a boiling excavation is longer sheets: driving them deeper spreads the same head loss over more sand.